polyester woven geotextile used in the road construction
polyester woven geotextile used in the road construction
1.construction equipment
2.polyester woven geotextile's storage
3.polyester woven geotextile's clipping method
4.construction sequence
1.1construction equipment
(1)road roller
(2)plate rammer
(3) small road roller
1.2 clipping equipment
(1)box cutter
(2)hot-melt knife
2.1 polyester woven geotextile's storage
It should be kept in a dry place, away from direct sunlight and rain. If possible, a simple material storage shed can be set up. When the material to the site, the site responsible for receiving materials, must check the material is not damaged, if there is a greater damage to take photos and timely contact with the manufacturer.
3.1 polyester woven geotextile's clipping method
Before cutting geotextiles, the radial and zonal directions of the material should be marked, and the cutting direction should be perpendicular to the radial direction. After cutting, to prevent the WEFT yarn from sloughing off, use a hot melt knife or soldering iron to hold the yarn in place
4.1 Laying of polyester woven geotextile
1.Any equipment for laying of woven geotextile shall not be walked directly on top of the woven geotextile after geotextile been laid down.
2.Installer shall not roll out so much of the woven geotextile beyond a reasonable range of welding and stitching every day.
3.All exposed woven edges shall be immediately pressed with sandbags or other permitted weights to prevent the woven geotextile from being blown up by the wind and pulled out of the surrounding place during strong wind weather.at this time should be prohibited for the laying of woven geotextile.
4.The surrounding and underlying geotextile materials must be protected from damage during the cutting process.
5.Woven geotextile must be laid in such a way that they do not cause folding or wrinkling of the woven geotextile or the underlying geotextile material. Any possible wrinkling, folding, or arching of other geotechnical materials should be re-laid or eliminated by cutting and repairing.
6.The installer must try to protect the laid woven geotextile from possible damage caused by the construction machinery. Installation personnel and on-site supervision engineers must check the laid woven geotextile for other material under the woven geotextile, worn woven fabric or improper seams. Any other material must be removed. Any worn out material and unloving seams must be mended.
4.2The connection and suture of woven geotextile
The overlapping place are seamed, the minimum lap width of woven geotextile is 100 mm.
All woven geotextile, seams and damage /or defects caused by installation shall be inspected by the worker and the quality inspector. The defective seams must be clearly marked on the woven geotextile and repaired by the worker.