How to reduce the cost of geomembrane in fish ponds?


First: Transportation: Do not pull or harden the geomembrane during transportation to avoid sharp objects. This can reduce the cost of product damage.

1

Second, laying:

1. Before cutting the geomembrane, the relevant dimensions should be accurately measured and then cut according to the actual conditions.

2. When laying geomembrane, it is less necessary to weld less, and under the premise of ensuring quality, try to save raw materials. It is also easy to guarantee quality.

3. The joint width of the joint between the film and the film is generally not less than 10 cm, and the weld alignment direction is usually parallel to a larger slope, that is, arranged along the slope direction.

4. Usually in corners and deformed areas, the length of the joint should be as short as possible. Except for special requirements, in the range of 1.5 m from the slope or stress concentration area on the slope with slope greater than 1:6, no weld seam is allowed.

2

5. During the laying of geomembrane, artificial folds should be avoided. When the temperature is low, it should be tightened and leveled as much as possible.

6. After the geomembrane is laid, the walking and moving tools on the membrane surface should be minimized. Any objects that can cause damage to the impermeable membrane should not be placed on the membrane or carried on the membrane to avoid the membrane. Cause accidental damage.

Walk on the membrane or carry it on the membrane to avoid accidental damage to the membrane.

3

In addition, the bottom and wall of the fish pond should be flat, then the geomembrane should be laid, the joint should be reserved for 6 but 10 cm, and the geomembrane welding machine should be used for welding. When laying, try to make the joint as much as possible, reduce the joint part, and lay a layer on the surface of the geomembrane. The soil or fine sand of the sundries, 8 but 10 cm thick, is used as a protective layer. The geomembrane is rotted when the construction is free. The wall of the fish pond is vertical, the brick can be cut, and then the bottom and the wall of the four walls are cemented. If the fish pond is sloped, it is not necessary to cut the brick wall, and the cement is directly deposited on the welded geomembrane.